Phantom F4K Royal Navy
Aircraft Carrier Fighter/Supersonic Interceptor
Ground Attack/Strike.

The Air Traffic Control Team

  • The Air Traffic Control Team for for last Commision of HMS Ark Royal seen here.
  • Duties included Radar Director for marshalling the aircraft at night for a Carrier Controlled Approach (CCA) or in bad visibility.
  • The CCA was a talk down approach giving the pilot glideslope and centerline  information and corrections until the pilot could go visual on the Deck Landing Projector Site (DLPS)
  • In these conditions it was always good for the pilot to hear a reassuring familiar voice. It steadied the pilot before hooking on at night. (admin)

Lt Dave Brocklebank RN (seen kneeling) contibuted this article.



Size Matters. The reader can access the degree of difficulty for deck landing Fleet Air Arm Pilots when viewing HMS Ark Royal (left) and USS Nimitz together.

(archive Brocklebank)


The Final Commission 1978

April 1978

  • HMS Ark Royal sets sail from Devonport Dockyard for her final Westlant deployment.
  • Her sister ship at anchor,HMS Eagle, awaits the breakers yard. She will provide spares for HMS Ark Royals' final Commission.
  • Above, a beautiful calm day in the Hamoaze of the River Tamar at Plymouth, Devonshire, England.
  • Cornwall is on the left, Devonshire is on the Right. The Torpoint ferry can be seen almost midway to the back of the photograph. There was little clearance in crossing the heavy chains of the ferry. This had to be done on spring flood tides.

archive Lt. Dave Brocklebank RN.

Commission of 1977/1978

  • HMS Ark Royal Sails from Devonport for Post Refit Acceptance Trials the Air group including 892 Sqn Phantom F4K's conduct DLP's.
  • 19th June, trials complete sailed for the Queens Silver Jubilee at Spithead June 28th 1977.
  • Rehearsals and much painting at Spithead 20th/28th June 1977.
  • 30th June Plymouth Sound. Embark mini CAG (Carrier Air Group) including 3 Phantom F4k's of 892 Sqn for pre-final deployment flying trials
  • Navy Days at Devonport followed by leave and modification refit.
  • 1st Sept 1977, sailed from Devonport after refit. For her final deployment.
  • Passage off West Coast of Ireland. Air group embark 5th September.
  • Workup 5th/15th September in Moray Firth. Visit Leith 15th/20th September, then second workup in Moray Firth 20th/28th including night flying.
  • HRH Prince Charles visits 21st September 1977. He experiences a catapult shot, courteously of 809 Buccaneer Sqn.
  • Visit Hamburg 30th September/5th October.
  • 7th/14th October Third Phase Workup in the Moray Firth and ORI.
  • Cdr M.H.G. Layard relieves Cdr R.J. Northard as Cdr (Air)
  • Passage West Coast Ireland
  • Ex Ocean Safari 17th/28th October 1977, starting in Bristol Channel areas progressing through the bay of Biscay, off Lisbon and back to UK waters.11 ships of 8 countries participate. 400 hours of continuous flying operations.
  • Passage to Gibraltar 28th October to 1st November.
  • Gibraltar1st/2nd November
  • Flyex off Sardinia 4th November
  • Malta5th/12th November
  • 12th November passage to Toulon an Ex Isles D'or 15th/26th November. 7 nation exercise including USN CVA Saratoga.
  • Naples28th November 5th December
  • Flyex enroute and at Gibraltar 5th/10th December
  • Air Group disembark Bay of Biscay 12th December
  • Plymouth"C" buoy 15th December 1977. Fog delayed entry. Berthed 16th December at Devonport for leave and DAMP. (Dockyard Assisted Maintenance Period) until February 1978
  • 24834 Nautical miles steamed during deployment
  • 21st February sailed post DAMP sea acceptance sea trials. Lyme Bay, Portland.
  • 22nd Feruary/5th March air group on board.
  • Sea Inspection 27th February
  • 5th March at Plymouth for Families day.
  • Final leave given before the final deployment 5th April 1978 sail Devonport for Westlant deployment 1978. The Final One.
  • 6th April, Air group embarked.
  • 12th April, position off the Azores
  • 17th April, Air group disembark and ship berths at Roosevelt Roads Puerto Rico
  • Sail from Roosevelt Roads
  • 20th April/8th May, Work Up and Atlantic Fleet Weapons Range. Live Missile firing.892 Sqn fire Sparrow and Sidewinders at drone aircraft.
  • 9th/15th May visit the US Virgin Islands, anchored off Charlotte Amalie
  • 15th/30th May 1978 Passage to and work up in the Jacksonville sea areas.
  • Ex Solid Shield. Strike USS John F. Kennedy 23rd/24th May
  • 30th May/14th June 1978. Visit Fort Lauderdale
  • 14th/23rd June Jacksonville Sea areas for private flyex
  • 14th June, 1000th Cat shot and Deck Landing 1978 recorded.
  • 22nd June Air group disembark prior ships visit to Mayport 23rd June/8th August
  • 8th/13th August passage to Norfolk Virginia area and flyex
  • 14th August/21st August visit Norfolk
  • 23rd August leave USA and sail eastward to the Azores, Ex Common Effort until 31st August.
  • 4th/19th September, Ex Northern Wedding.Position 61N20W. 200 ships, nine nations, including USS Forrestal
  • 19th September enter Moray Firth
  • Passage to Gibraltar 20th September/2nd October
  • 2nd October leave Gibraltar for last time flying the 450ft Paying Off Penant
  • 2nd/16th October Ex Display Determination. Ships of 6 nations and USN carriers Forrestal and J.F. Kennedy. 2000 cat shots and arrested landings recorded
  • 16th/21st October 1978 visit Naples
  • 21st/27th November Flyex south east of Sicily
  • 27th October/6th November visit Athens
  • 2nd/6th November Flyex south east of Sicily, exercise with USS Saratoga
  • 6th/16th November Malta. 10,000 people line the grand harbour so see the final farewell.
  • 16th/18th November private flyex south of Sardinia.
  • 18th November 1978, the last fixed wing recoveries are made on board HMS Ark Royal.
  • 20th/25th November visit Palma, Mallorca
  • 27th November 1978, the last fixed wing catapult launches in Royal Navy aviation occur as the squadrons disembark off the south coast of Spain.
  • 28th Nov/4th December. Passage to Devonport
  • Monday 4th December 1978. Ark enters Plymouth sound in procedure Alfa flying the 450 ft paying off pennant. Thousands of people lined the vantage points of Plymouth Sound.
  • 0850 hrs. Captain Anson orders "Ring off main Engines" The reply came so "Engines rung off for the last time, Sir".
  • 42255 Nautical Miles steamed on this final deployment.

Commission of 1973/1976

HMS Ark Royal 1974-1976

  • November 1973. Captain Gerard-Pearse assumed command while the ship was in Dry Dock in Devonport Dockyard
  • Sailed Devonport in July 1974 in the role of "To maintain NATO's Maritime Force in the North Atlantic".
  • Captain Graham assumes Command
  • Ship deploys and participates in Ex Northern Merger 1974 off Norway. Ex Springtrain1975 off Gibraltar and private flyex's visiting Gibraltar and Malta
  • Further deployment to the West Atlantic and participation in Ex Safepass 1976 off Virginia and private flyex's visiting Norfolk, Mayport and Fort Lauderdale for the American bi-centennial celebrations.
  • Further private flyex's in the Caribbean. The Phantom F4K's of 892 Sqn conducted Missile Firings in the Atlantic Fleet Weapons Range off Puerto Rico.
  • Visits to Virgin Gorda and St Thomas followed the Missile firings and the ship then sailed for official ceremonial visits to Barbados and Rio de Janerio.
  • Deployment complete the Royal Navy's largest ship returned to Devonport for leave.
  • Ex Ocean Safari 1976 off Norway. Change of ships command 25th September 1976 off Scotland. Captain E.R. Anson assumes command.
  • Passage to Lisbon. Full divisions in tropical whites.
  • Visit Gibraltar and Ex Display Determination with USN Carriers Nimitz and America, and French Carrier Clemenceau
  • FONAC. Admiral Eberle transfers to USS America by Phantom F4K of 892 Sqn. Pilot Lt Martyn H. Dean. Returns to HMS Ark Royal by same method after exercise briefings.
  • Visit Toulon French Navy Base 13th/18th October 1976
  • 18th October sail Toulon. Air group disembarks to home bases. With the loss of their historical home base RNAS Yeovilton, 892 Squadron's Phantom F4K's return to RAF Leuchars in Fife.
  • Ship immediately commences preparation for the refit in Devonport. Dockyard maintenance crews are embarked to commence work on the catapults during passage.
  • Refit at Devonport October 1976 to June 1977
  • 13th December 1976 ship is moved from Outer Wall to Number 10 Dry Dock
  • Sub Surface refit complete she is floated 28th February 1977

Commission of 1970/1973

Under Construction (892 Sqn activity to be added)

From the archive of Lt. Cdr. Ian Pratt RN. , who served as a Gunnery officer (G2) on HMS Ark Royal 1969/1972. Ian flew in a Phantom F4k of 892 Sqn with the Squadron Commander Officer prior to the very first embarkation.

HMS Ark Royal 1966 to 1973

  • May 1st to 15thFlying Trials. Lyme Bay/Plymouth Areas
  • 15th to 11th JuneDevon port. Post Flying trials rectification
  • 14th to 20th JuneFirst Work Up in the Moray Firth
  • 20th to 22nd June At anchor off Lossiemouth
  • 22nd to 25th JuneFirst Work Up Moray Firth continued
  • 27th to 30th JuneAt Liverpool
  • 1stto 9th JulySecond Work Up Bristol Channel
  • 10th to 20th JulyDevonport for SMP
  • 20th to 27th JulyThird Work Up Bristol Channel
  • 28th to 29th JulyOperational Readiness Inspection (ORI)
  • 31st July to 3rd SeptemberDevonport Assisted Maintenance Period (AMP)
  • 3rd to 5th SeptemberFlyex in Plymouth Areas
  • 5th SeptemberFamilies Day
  • 7th to 17th SeptemberFlyex and Workup Bristol Channel and Irish Sea. 8th to 9th Sept on standby for burning freighterSt Brenden off Lundy island
  • 20th to 26th SeptemberExercise "Northern Wedding"
  • 28th September to 2nd OctoberAt Oslo. Exercise Northern Wedding. Post Exercise Debrief (PED) at Kolsas
  • 4th to 10th OctoberDevonport. Repair defects on Catapult and Arrester Gear
  • 11th to 14th OctoberCatapult and Arrester Gear Trials. Lyme Bay and Plymouth Areas
  • 19th to 29th OctoberAt Malta. SMP.
  • 29th to 14th NovemberExercise "Lime Jug" 1970
  • 9th NovemberCollision with Surveillance Russian Navy Kotlin Class (Side Number 365) South of Greece
  • 9th to 10th NovemberSearch and Rescue Operations
  • 14th NovemberStandby for HMS Fife with major fire
  • 16th to 25th NovemberAt Malta. SMP.
  • 26th to 30th NovemberFlyex. Malta Areas
  • 29th NovemberHot Air Balloon Launch to Malta
  • 1st DecemberFilming of "MedPatrol"
  • 3rd to 8th DecemberAt Naples
  • 8th to 10th DecemberFlyex. Sardinia Areas
  • 12th to 14th DecemberAt Gibraltar
  • 18th to December to 15th April 1971Devonport Dockyard Refit
  • 9th MarchCaptain J. O. Roberts. RN. Assumes Command
  • 15th to 18th AprilPost Refit Trials. Plymouth/Portland/Clyde Areas
  • 19th to 29th AprilWork Up Moray Firth
  • 30th April to 3rd MayAt Rosyth
  • 4th to 18th MayWork Up and Harrier Deck Trials. Moray Firth
  • 9th to 10th MayAt anchor off Lossiemouth
  • 11th to 19th May Work Up and Harrier Trials. Moray Firth
  • 16th MayAt anchor off Lossiemouth
  • 21st May to 2nd JuneDevonport. SMP.
  • 2nd to 11th JunePassage to West Indies. Flyex on Passage
  • 11th JuneAt anchor off Puerto Rico
  • 12th to 15th JuneExercise "Rimex/Barex" Atlantic Fleet Weapons Range (AFWR)
  • 16th to 19th JuneExercise "Opredex" with USS America at the AFWR and transit to Bermuda.
  • 22nd to 29th JuneAt Fort Lauderdale (Port Everglades)
  • 30th June to 7th JulyAt Mayport. SMP)
  • 11th to 18th JulyFlyex and Phantom Hot Weather Trials.(AFWR)
  • 19th to 21st JulyAt St Thomas Virgin Isles
  • 21st to 30th JulyOn passage to Plymouth28th July meet yacht "British Steel" 200 nm south west of Lands End
  • 30th July to 2nd AugustAt "Charlie Buoy" Plymouth Sound
  • 2nd to 4th AugustOperation "Lymelight". Lyme Bay
  • 5th AugustFamilies Day (Up Harbour)
  • 5th August to 14th SeptemberDevonport. AMP
  • 17th to 25th SeptemberFlyex. Moray Firth.
  • 27th September to 4th OctoberExercise "Royal Knight". Norwegian Sea/North Cape/North Sea
  • 4th to 7th OctoberPXD at Rosyth for Exercise "Royal Knight"
  • 7th to 8th OctoberExercise "Magic Sword IV". North Sea
  • 9th to 29th OctoberAt Portsmouth. SMP.
  • 30th October to 2nd NovemberFlyex South West Approaches
  • 4th NovemberMemorial Service for the third HMS Ark Royal 3. East of Gibraltar.
  • 5th to 9th NovemberAt Palma
  • 11th to 14th NovemberExercise "Med Passage" with USS Independence. Ionian Sea.
  • 15th to 18th NovemberFlyex. Malta Areas.
  • 19th to 24th NovemberAt Malta SMP.
  • 25th NovemberFlyex. Sardinia Areas.
  • 26th November to 2nd DecemberFlyex. Gibraltar Areas.
  • 2nd to 4th DecemberAt Gibraltar
  • 7th December to 20th January 1972Devonport. AMP.
  • 20th JanuarySail for Virginia Capes Area
  • January 26thDiverted to British Honduras. HMS Ark Royal Aircraft overflew Belize.
  • 30th January to 1st FebruaryFlyex. Key West Areas.
  • 4th to 11th FebruaryAt New York
  • 14th to 18th FebruaryFlyex. Puerto Rico Areas (AFWR)
  • 19th to 20th FebruaryAt Virgin Gorda
  • 22nd to 27th FebruaryExercise "Lantreadex" with USS F. D. Roosevelt. (AFWR).
  • 29th FebruaryAt Roosevelt Roads
  • 1st to 9th MarchPassage to Devonport. Flyex on passage.
  • 9th March to 6th JuneDevonport. (DED)
  • 6th to 11th JunePost DED trials. Plymouth Portland Areas.
  • 12th to 16th JuneFlyex South West Approaches.
  • 19th to 23rd JuneFlyex Cape Wrath/Moray Firth
  • 26th to 29th JuneFlyex SW Approaches
  • 30th June to 10th JulyAt Portsmouth. SMP. "Meet the Navy"
  • 11th to 12th JulyFlyex SW Approaches
  • 13th to 16rd JulyExercise "West Hoe" off W. Ireland.
  • 17th JulyOperation Readiness Inspection. (ORI).
  • 18th to 31st AugustDevonport AMP.
  • 22nd AugustCaptain A. D. Cassidi RN assumes command.
  • 3rd SeptemberAnchor off Lossiemouth
  • 4th to 11th SeptemberFlyex Moray Firth.
  • 14th to 28th SeptemberExercise "Strong Express". Norwegian Sea/North Cape
  • 29th September to 5th OctoberAt Rosyth. PXD.
  • 5th to 10th OctoberFlyex. North Sea. Moray Firth
  • 12th to 17th OctoberAt Oslo
  • 20th October to 7th NovemberAt Portsmouth. SMP.
  • 7th to 14th NovemberFlyex SW Appraches
  • 17th to 22nd NovemberAt Barcelona
  • 25th to 26th NovemberExercise "Corsica 72"
  • 27th November to 4th DecemberFlyex Sardinia Areas
  • 6th to 8th DecemberAt Gibraltar
  • 12th December to 25th January 1973Devonport. AMP/
  • 26th January to 2nd FebruaryFlyex SW Approaches
  • 4th to 8th February Exercise "Sunny Seas" off Portugal
  • 9th to 12th FebruaryAtGibraltar
  • 14th to 22nd FebruaryExercise "Sardex" off Sardinia
  • 23rd February to 6th March At Malta AMP
  • 6th to 11th MarchExercise "Ruler". Western Mediterranean West of Gibraltar
  • 15th March to 30th AprilDevonport AMP
  • 1st to 5th MayFlyex Plymouth Areas
  • 5th to 14th MayPassage to West Indies. Ex "Passex" with French Carrier Group
  • 14th MayAt Roosevelt Roads
  • 15th to 24th MayFlyex AFWR
  • 25th to 27th MayAt St Thomas Virgin isles
  • 31st May to 6th JuneExercise "Lantreadex" with USS F.D. Roosevelt. AFWR.
  • 8th to 14th JuneFort Lauderdale. Port Everglades.
  • 15th to 19th JuneFlyex. Jacksonville Areas.
  • 19th to 30th JuneAt Mayport. SMP.
  • 30th June to 9th JulyPassage to North of Scotland. Flyex on passage.
  • 9th to 13th JulyExercise "JMC 148". (Joint Maritime Cooperation)
  • 14th to 17th JulyFlyex. North Sea.
  • 18th to 23rd JulyAT Rosyth. Fleet Gathering.
  • 23rd to 24th JulyExercise "Sally Forth". North Sea.
  • 26th July Families Day
  • 26th JulyArrive Devonport. Prepare for refit.
  • 25th October 1973

HMS Ark Royal awarded the freedom of the City of Leeds

9th November 1970. A Russian Navy Kotlin (SAM) collides with HMS Ark Royal while shadowing her.
Fleet Air Arm Royal Navy
Phantom F4K
Site hosted by HTL Support. © Phantom F4K. All Rights Reserved.